Highest grade undeveloped open pit gold-tungsten project in Cloncurry today
The greenfield Highway Gold-Tungsten Project (Highway) is one of two high-value critical minerals projects being developed by Transition Resources, approximately 40 km south-west of Cloncurry, Qld.
Highway includes shallow high-grade gold deposits, with by-products tungsten, heavy rare earth elements, and cobalt. It sits within a 21 km long previously unknown gold-rich mineral system corridor, with no prior drilling and substantial growth potential. Development options include toll treating or construction of a low-cost gravity plant, with first mining from as early as 2027.
Road and rail pass by the mine gate, and the nearby Cloncurry township provides an operational base for a skilled workforce, essential mining services, and modern amenities such as a jet airport.
Phase 1 (first 2 years) production targets1
(see Competent Person Statements 5-1-2026)
Phase-1 mine life
(Open pit only)
To be extended
Phase-1 capex
(Build gravity plant)
Also tolling options
Phase-1 pre-tax NPV8
(Build gravity plant)
MID pricing
510t tungsten
(In pre-concentrate)
Phase-1 production
Input prices: US$4,000 per ounce gold, AUD/USD 0.67 (by-products not yet included in revenue modelling).
Note 1: internal estimates are subject to change, as new data becomes available, and independent studies (pending) are completed.

Highway Gold Project Highlights
Highway is 35 km south-west of Cloncurry
Cloncurry is 120 km east of Mt Isa, in North West Queensland, Australia
Highway commodities: gold (possible tungsten by-products)


Key Project Facts
- Large, 100% owned ground position of 1,042 km2 of tenure with no prior ownership legacies.
- Breakthrough exploration methods from a 6-year R&D program are delivering new greenfield and brownfield discoveries, with hundreds of priority targets yet to be drill tested.
- The unfolding new discoveries commence from surface, with in-pit grades of ~3.5 g/t gold and ~0.15% tungsten (WO3), offering attractive starter pit economics and accelerated revenue.
- Clean cohesive orebodies, shallow open-pits, and low-capital development options, including cost sharing with Transition’s nearby copper project.
- The 2021 mineral resource (below) was estimated from 4,900 metres of drilling. The pending resource update will include 34,000 metres of drilling including 203 informing drill holes with 950 cohesive intervals averaging 3.15 g/t Au (weighted average). All resources remain open.
- Target resources are multiples of the below 2021 maiden resources.
Highway Inferred Mineral Resource at a cut-off grade (COG) of 0.5 g/t Au (update pending 2026)
| Inferred | Tonnage (Kt) | Au (g/t) | REE+Y (ppm) | W (ppm) | Co (ppm) |
|---|---|---|---|---|---|
| West Area | 18 | 3.36 | 436 | 129 | 158 |
| East Area | 126 | 4.43 | 595 | 461 | 211 |
| Total | 144 | 4.29 | 576 | 420 | 204 |
Note: resource estimate based on drilling over just 2 months in 2020 (4,900 metres). (see Competent Person Statements 5-1-2026)
Resource update pending1
The pending resource update will include drilling in 2020, 2021, 2022, and 2024 (38,000 metres).
Guidance based on internal estimates (Non-JORC20012) indicate the following target ranges are possible:
1 to 1.4Mt @ 3.0 to 3.4 g/t Au, and 0.12 to 0.15% WO3
Note 1: internal estimates are subject to change, as new data becomes available, and independent studies (pending) are completed.
RC drill chips from high-grade zones at Highway including oxide (left) and sulphides (right)

Drilling at Highway
Earlier drilling programmes included a regional-scale vectoring focus to inform Transition’s R&D programmes.
More recent drilling is dominated by a commercial focus, including infill drilling.
| Year | Drill type | Drill holes | Min holes | Min intervals | Av Int width | Au ppm | Metres drilled | Comment |
|---|---|---|---|---|---|---|---|---|
| 2020 | RC | 88 | 52 | 265 | 5.1 | 3.80 | 5,585 | 2021 MRE 0.14Mt @ 4.29 g/t Au |
| 2021RC | RC | 144 | 74 | 299 | 4.0 | 3.20 | 16,881 | |
| 2021DD | DD | 5 | 5 | 33 | 6.6 | 7.93 | 433 | |
| 2022 | RC | 97 | 49 | 190 | 3.9 | 2.23 | 10,374 | |
| 2024 | RC | 54 | 34 | 180 | 5.3 | 2.24 | 5,031 | |
| Totals | ALL | 388 | 214 | 967 | 4.5 | 3.16 | 38,304 | Pending MRE |
The above mineralised holes include overlap between the gold and tungsten domains.
The Highway deposits are located at the north end of a new 21km long, regional scale epithermal gold system discovery by Transition. Approximately 2 km of this system has been sporadically drilled, and only 1 km sufficiently drilled to support resource estimation.
The epithermal vein and breccia system which occurs for a strike length of ~21 km, appears to be structurally controlled in axial plane shear zones of parasitic fold on the regional Mitakoodi anticline. Based on U-Pb, LA ICPMS geochronology of xenotime and monazite timing of mineralisation is between ~1,490 and 1,530 Ma. The epithermal Au-Te-W-REE mineralisation is hosted by siliceous breccias and carbothermal lithologies. Gold is present either as free gold or as Au tellurides. Tungsten is hosted by wolframite and scheelite. The REEs are hosted by xenotime and monazite.
Highway is associated with a large-scale geophysical anomaly

Current exploration & mining projects
“Transition may have discovered one of the largest previously unrecognised epithermal-gold, copper-porphyry systems, globally.”
Transition’s Technical Advisor R&D, Emeritus Professor Ken Collerson